Showing posts with label Singletrack Trail Construction. Show all posts
Showing posts with label Singletrack Trail Construction. Show all posts
Single Track Trails

Building single track (natural surface) trails in varying terrain using mechanized methods.
- designed and built using time proven sustainable techniques minimizing the maintenance needs other than routine maintenance duties
- taking measures to minimize environmental impacts
- 2' to 4' wide trails
- rolling contour design to ensure good drainage and erosion control
- clearing vegetation
- full bench construction technique
- out slope 2% to 8%
- raked and graded tread finish
- removal of roots
- removal of loose surface rocks
- installation of all types of drainage crossings (armored crossings, culverts, small bridges, etc.)
- utilizing the existing terrain to create a natural feeling trail that flows and blends in with the environment
- design and construction of multi-use trails
- design and construction of purpose built trails for mountain biking ( cross country, free ride/downhill), hiking, equestrian
Subscribe to:
Posts (Atom)
