Showing posts with label Singletrack Trail Construction. Show all posts
Showing posts with label Singletrack Trail Construction. Show all posts

Public Trail at Victory Ranch

In 2015 where we started construction near Francis, UT of a 6 mile mountain bike optimized, flowy single track. This trail was completed in spring of 2016. It can be accessed through Coyote Canyon Trail near Heber, UT.






Galena Summer Trails Project

From June to October we built trails for the Blain County Recreation District in Sun Valley, ID. We were able to build approximately 14 miles of mountain bike optimized trails in the Galena Lodge area.





Single Track Trails


Building single track (natural surface) trails in varying terrain using mechanized methods.



  • designed and built using time proven sustainable techniques minimizing the maintenance needs other than routine maintenance duties
  • taking measures to minimize environmental impacts

  • 2' to 4' wide trails

  • rolling contour design to ensure good drainage and erosion control

  • clearing vegetation

  • full bench construction technique

  • out slope 2% to 8%

  • raked and graded tread finish

  • removal of roots

  • removal of loose surface rocks

  • installation of all types of drainage crossings (armored crossings, culverts, small bridges, etc.)

  • utilizing the existing terrain to create a natural feeling trail that flows and blends in with the environment

  • design and construction of multi-use trails

  • design and construction of purpose built trails for mountain biking ( cross country, free ride/downhill), hiking, equestrian