tag:blogger.com,1999:blog-39245864566258826022024-03-13T05:36:30.330-06:00Sagebrush Trails & Services, LLCUnknownnoreply@blogger.comBlogger29125tag:blogger.com,1999:blog-3924586456625882602.post-72407567087147413852018-12-04T10:19:00.000-07:002018-12-04T10:21:57.231-07:00We Have Moved
Sagebrush Trails had to re-structure and closed it's doors. We are now Creative Trails, LLC. Our new contact information is:
Bob Radke, Owner
c: 435-640-3063
radkero@gmail.com
createtrails.com
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-55606659881887157032017-07-25T19:02:00.004-06:002018-01-10T13:23:09.823-07:009-Line Dirt Jumps
This is a project in Salt Lake City under I-15. We built a series of dirt jumps and re-vamped an existing pump track.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-46878466159861008452017-07-25T18:57:00.001-06:002017-07-25T19:06:32.307-06:00Price City Bike Park - Plan and Design
We worked with Price City in central Utah to design a community bike park. Their plan is to apply for a grant for funding and build in the next year or so. The location they chose is pretty cool.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-6334771623114266612017-01-07T10:02:00.001-07:002017-01-07T10:16:19.198-07:00High Star Ranch Mountain Bike Trails
This is a great project. When completed, 16 miles of mountain bike specific, public trails will enhance the Kamas Valley in Kamas, UT. Most of the trails are directional with the downhills enhanced with berms, rock gardens, drops, small booters, and well orchestrated flow. Currently, 10 miles are completed and ready to ride. We add some more advanced downhill trails during the summer of 2017.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-36378087768453913672015-11-24T19:03:00.000-07:002015-11-24T17:57:16.981-07:00Draper Cycle Park
In the spring of 2015 we built 2 pump tracks, a large one and a small one, and 3 jump lines, beginner to expert.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-66005577412218199232015-11-22T19:19:00.001-07:002017-01-07T09:53:08.824-07:00Public Trail at Victory Ranch
In 2015 where we started construction near Francis, UT of a 6 mile mountain bike optimized, flowy single track. This trail was completed in spring of 2016. It can be accessed through Coyote Canyon Trail near Heber, UT.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-22454873762809970812015-11-22T19:11:00.004-07:002015-11-22T19:22:14.441-07:00Galena Summer Trails Project
From June to October we built trails for the Blain County Recreation District in Sun Valley, ID. We were able to build approximately 14 miles of mountain bike optimized trails in the Galena Lodge area.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-57663080183203648582015-01-31T12:39:00.000-07:002015-01-31T12:39:44.755-07:00Maple Ridge Ranches
This project included re-building and new construction of over 7 miles of hiking and equestrian trails in 2013 and 2014.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-20043619881473556042012-11-03T15:00:00.000-06:002017-01-07T14:01:40.322-07:00
Sagebrush Trails & Services, LLC specializes in mountain bike specific trails and facilities with over 25 years experience in planning, designing, construction and all maintenance issues in all types of trails. We take pride in using time-proven sustainable techniques in each project and looking at each trail differently to create unique trail Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-86231536194081522012012-11-03T14:45:00.000-06:002017-01-07T14:20:49.940-07:00
6530 Snowview Dr.
Park City, UT 84098
(435)658-1695
radkero@gmail.com
Sagebrush Trails & Services has been in business since 2008. In 2014 Sagebrush Trails brought on two new partners, Derek Thomson and Ric Stattin, Combined, we have over 25 years of experience in the trail construction industry. We have extensive experience in a broad range of trail related Anonymousnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-81366696910227356962012-10-01T19:35:00.000-06:002012-11-11T19:38:32.024-07:00Silver Creek Trail
Sagebrush Trail completed the design and construction documentation for a 2 + mile soft surface trail in the Silver Creek neighborhood in Park City, Utah.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-91797270343373457802012-08-31T11:32:00.000-06:002015-01-31T12:19:46.983-07:00Payroll Trail at Deer Valley
In the summer of 2012 we planned, designed, and constructed a new downhill trail for Deer Valley Resort. This trail is fast with flowy berms, bumps, drops, jumps, and a section that runs in and out of a gully.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-81374054170532686642012-06-02T20:16:00.000-06:002012-11-11T11:09:58.017-07:00Trail at Sagebrook HOA
Planning, design, and construction of one mile of natural surface trail built with my machines. It was designed for beginners as the neighborhood is full of kids and moms with baby joggers.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-46366502285505652572011-11-06T08:58:00.004-07:002011-12-19T18:10:22.760-07:00XC Ski Trails near Utah Olympic ParkThis is a project I managed for Basin Rec. I worked with Gordon Lange, an ex US Ski Team coach and coach of the local nordic program, Jaime Kimball from the Utah Olympic Park, representatives of the open space commity, and co-workers at Basin Recreation where I helped plan and design 5 kilometers of XC ski trails. I managed the construction of the trail where I coordinated with contractors and Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-68136284498302287352011-11-06T08:41:00.003-07:002012-11-04T20:15:27.380-07:00Huber Grove, Wasatch Mountain State ParkThis was a mid summer job where I helped design and then went on to construct a couple of trail re-routes and re-treaded almost 1.5 miles of trail.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-80602303504632194812011-11-06T08:26:00.003-07:002012-11-04T20:15:41.821-07:00Dutch Hollow at Wasatch Mountain State ParkIn the spring I helped design and then machine-work a series of trail re-routes in the Dutch Hollow area of the Wasatch Mountain State Park in Wasatch County, Utah.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-82840082018277460202010-09-13T18:35:00.002-06:002012-11-05T20:13:14.832-07:00Road to ArcylonThis is the latest downhill trail I worked on for Basin Recreation. All the planning, designing and construction was done in a partnership with WAFTA (Wasatch Area Freeride Trails Association), a local non-profit club that promotes freeriding in the Salt Lake City area. This was a great project and the volunteers from WAFTA were great to work with, it wouldn't have happened with out them. The Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-87020181938625319582010-07-01T19:46:00.000-06:002012-11-04T20:16:04.776-07:00Treasure Mountain Middle School Phase IIThis was another job in the wetlands for the school district in Park City. We built 120 feet of boardwalk, two observation decks, and 500 more feet of trail.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-35626821226705145442010-06-03T08:49:00.000-06:002012-11-04T20:16:26.219-07:00Super G Trees at Deer ValleyThis is a beginner-level downhill trail I designed and constructed at Deer Valley Resort in Park City, UT. It is only a couple thousand feet long but it has lots of flow and a few easy jumps.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-56490750312513463912010-05-30T08:27:00.000-06:002012-11-04T19:35:37.282-07:00Bad Apple TrailThis is a trail I designed and constructed that went through a band of solid rock. This was a technical build project that turned out awesome.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-67023798991604276482009-09-30T19:56:00.001-06:002012-11-04T20:16:44.853-07:00Ross Creek TrailThis was a short re-route project I completed at the Jordanelle State Park in Wasatch County, UT.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-26707841192703296752009-08-10T19:45:00.001-06:002012-11-04T20:17:09.626-07:00Idaho Velodrome and Cycle ParkIn August I went to Eagle, ID to help construct a downhill trail at the Idaho Velodrome and Cycle Park. This is a 5 foot wide trail with 15 foot gap jumps and large burms in the turns. See the video of the completed trail:
www.youtube.com/watch?v=yQemGqndyQo
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-4029597742032809312009-07-05T18:43:00.001-06:002012-11-04T20:17:25.055-07:00Wetland Trail at Treasure Mountain Middle SchoolHere I designed, planned and constructed 700' of elevated trail through some wetlands. The top four inches of organics and top soil were excavated and hauled away, then 6" of road was laid over geotextiles and boardered with lumber.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-19651341442632374422009-02-02T18:05:00.007-07:002012-11-04T20:17:40.333-07:00Antelope Island State ParkThis job consisted of finish work only. The state parks cut the trail with a Sweco. My job was to dress the backslope, smooth the tread, remove rocks, and kick the berm.
Unknownnoreply@blogger.comtag:blogger.com,1999:blog-3924586456625882602.post-21639062360297516342009-02-02T18:01:00.006-07:002015-01-31T12:38:34.073-07:00Sunpeak HOA Connector
This is one mile connector trail built for the Sunpeak HOA in Park City, UT in 2008 that connects the recreation center to the public trail system.
Unknownnoreply@blogger.com