We Have Moved

Sagebrush Trails had to re-structure and closed it's doors. We are now Creative Trails, LLC. Our new contact information is:

Bob Radke, Owner
c: 435-640-3063
radkero@gmail.com
createtrails.com


9-Line Dirt Jumps

This is a project in Salt Lake City under I-15. We built a series of dirt jumps and re-vamped an existing pump track.








Price City Bike Park - Plan and Design



We worked with Price City in central Utah to design a community bike park. Their plan is to apply for a grant for funding and build in the next year or so. The location they chose is pretty cool.

High Star Ranch Mountain Bike Trails

This is a great project. When completed, 16 miles of mountain bike specific, public trails will enhance the Kamas Valley in Kamas, UT. Most of the trails are directional with the downhills enhanced with berms, rock gardens, drops, small booters, and well orchestrated flow. Currently, 10 miles are completed and ready to ride. We add some more advanced downhill trails during the summer of 2017.





Draper Cycle Park

In the spring of 2015 we built 2 pump tracks, a large one and a small one, and 3 jump lines, beginner to expert.






Public Trail at Victory Ranch

In 2015 where we started construction near Francis, UT of a 6 mile mountain bike optimized, flowy single track. This trail was completed in spring of 2016. It can be accessed through Coyote Canyon Trail near Heber, UT.






Galena Summer Trails Project

From June to October we built trails for the Blain County Recreation District in Sun Valley, ID. We were able to build approximately 14 miles of mountain bike optimized trails in the Galena Lodge area.





Maple Ridge Ranches






This project included re-building and new construction of over 7 miles of hiking and equestrian trails in 2013 and 2014.


































Sagebrush Trails & Services, LLC specializes in mountain bike specific trails and facilities with over 25 years experience in planning, designing, construction and all maintenance issues in all types of trails. We take pride in using time-proven sustainable techniques in each project and looking at each trail differently to create unique trail experiences that are sustainable and environmentally friendly. 



Please contact us to help you complete your project.


Sagebrush Trails & Services, LLC
Bob Radke (managing member)
6530 Snowview Dr.
Park City, UT 84098
435-658-1695
radkero@gmail.com

 










6530 Snowview Dr.
Park City, UT 84098
(435)658-1695
radkero@gmail.com

Sagebrush Trails & Services has been in business since 2008. In 2014 Sagebrush Trails brought on two new partners, Derek Thomson and Ric Stattin, Combined, we have over 25 years of experience in the trail construction industry. We have extensive experience in a broad range of trail related services, from designing and construction to master planning, construction management and development of trail systems. 

Members:
Bob Radke (managing member)
Ric Stattin
Derek Thomson

Completed Projects  

  • 2016 - 2017 - High Star Ranch - currently building 16 miles of mountain bike specific trails, directional and open to the public, Kamas, UT
  • 2015 - Public Trail at Victory Ranch - currently building 6 miles of mountain bike optimized trails in Victory Ranch in Kamas, UT
  • 2015 - Galena summer Trails Project; built approximately 14 miles of mountain bike optimized trails around the Galena Lodge north of Sun Valley, ID
  • 2015 - Draper Cycle Park Pump Tracks and Dirt Jumps, designed and built two pump tracks and 3 dirt jump lines at Draper City Cycle Park
  • 2014 - Cyclo-Cross Stairs- Draper, UT, Draper City Cycle Park
  • 2013 - 2014 - Maple Ridge Ranches, Oakley, UT, over 7 miles of re-conditioning old trails and construction of new singletrack
  • 2012 - Sagebrook Trail, 1 mile natural surface, private, neighborhood trail
  • 2012 - Payroll Trail, 4,000' flow trail at Deer Valley Resort
  • 2011 - Dutch Hollow, Wasatch Mountain State Park, Wasatch County, UT, constructed approximately 3,400' of new trail and trail re-routes
  • 2011 - Huber Grove, Wasatch Mountain State Park, Wasatch County, UT, re-construction of approximately 200' of road base trail
  • 2011 - Huber Grove, Wasatch Mountain State Park, Wasatch County, UT, construction of approximately 1,100' feet of trail re-routes and re-treading of over 1.5 miles of existing trail
  • 2011 - Mountain Ranch Estate - construction of a short 800' trail connection and maintenance of over two miles of trail including vegetation and rock removal
  • 2011 - Sunpeak HOA, Park City, UT, maintenance and re-build of a section of trail
  • 2010 - Park city, UT, planned, designed and constructed 500' more trail in the Treasure Mountain International School Wetland Preserve, this project also included 120' of boardwalk and two observation platforms
  • 2010 - Park city, UT, designed and re-built the Super G Trees downhill trail at Deer Valley Resort,
  • 2010 - Park City, UT, designed and constructed a bridge on the Sun Creek Trail in Sunpeak HOA,
  • 2009 - Wasatch County, UT, trail re-route Ross Creek Trail in Jordanelle State Park
  • 2009 - Park City, UT built a driveway extension utilizing turf pavers, fabricated and installed two steel gates and a culvert grate
  • 2009 - Park city, UT, Sunpeak HOA, constructed 500 feet of natural surface trail and fabricated and installed 9 custom trail markers
  • 2009 - Eagle, ID, helped construct a down hill trail at the Idaho Velodrome and Bike Park
  • 2009 - Park City, UT, constructed 700 feet of soft surface trail and a 20 foot bridge in wetlands at Treasure Mountain International School
  • 2009 – Payson, UT, fabricated 44 custom wooden trail markers
  • 2008 – Antelope Island State Park, UT, finish work on 2.5 miles of newly cut trail
  • 2008–Park city, UT, Sunpeak HOA, planning, design, and construction on a 6000’ long, multi-use trail segment connecting the neighborhood to the public trail system in varying terrain
  • 2007 – Wanship, UT, Blue Sky Ranch, designed approximately 3 miles of trail and construction of approximately 7000’ of multi use, natural surface trail in varying terrain
  • 2007 – Wasatch County, UT, Canyon Trails, designed a 4 mile trail system and constructed approximately ½ mile of that system (development went bankrupt)
  • 2007 – Park City, UT, Mountain Ranch Estates HOA, planned designed and constructed approximately ¼ mile neighborhood connector trail


     Other trail related experience

Bob Radke (managing member)
 - Trails and Open Space Manager, Snyderville Basin Recreation District, Park City, UT, 2013 to present
  • Project Management
  • Trail Development, Planning,  Design
  • Master planning
  • Managing over 140 miles of trails and 1800 acres of open space

 - Trail Maintenance Supervisor, Snyderville Basin Recreation District, Park City, UT, 2003 to 2013
  • Developed the summer and winter trails maintenance program for all types of trails
  • Responsible for all aspects of maintenance for over 130 miles of trails, including natural surface, soft surface, hard surface, bike parks, and XC ski trails
  • project management
  • GIS based trail mapping
  • Planning and design of trails 
  • Construction of soft and natural surface trails, XC ski trails, parking areas, Trailside Bike Park
  •  Maintenance and repair of all tools and equipment
  • Fabricate specialty tools, sign posts, map boards,
  • Winter trail grooming
  • Planning, design and construction of a system of directional trails, a downhill trail, and skills park
  • Coordinate and lead volunteer work groups
  • Working with the public on all trail related issues

Derek Thomson (member)

Since 2008 Derek has worked for other trail firms or independently all over the country where he has designed and constructed a wide variety of trails from pump tracks to DH trails to multi-use trails, managed crews and riden his bike. Some of the projects he has had the opportunity to work on include:
  • Massenutten Bike Park, Massenutten, VA
  • Deadline Trail - Snowmass CO
  • 1st lift access trail in Taos Ski Valley, NM
  • Valmont Bike Park in Boulder, CO
  • Park City Dirt Jump Park
  • Draper Cycle Park SLC
  • Rhyolite Bike Park - Castle Rock CO

Ric Statten  (member)
Ric has been a mountain bike enthusiast for years and decided he would share his passion by getting involved in the construction end of the industry. He was fortunate to get valuable experience in helping build the expansion phase of the Trailside Bike Park.

    

 Trail related Training and Seminars

     
2001 IMBA Trail Solutions, Park City, UT
2002 IMBA Trail Solutions, Wasatch State Park, UT
2003 Utah Trails and Pathways Convention, Park City, UT
2004 Professional Trailbuilders Conference, Reno NV
2005 Utah Trails and Pathways Convention, St. George, UT
2006 IMBA International Summit, Whistler, BC
2006 California State Parks Trail Design Seminar, Huntsville, UT
2007 Utah Trails and Pathways Convention, (presenter), Ogden UT
2008 Professional Trailbuilders Conference, Reno NV
2008 IMBA International Summit, Park City UT
2009 Professional Trailbuilders Conference, Asheville, NC
2015 American Trails INternational Symposium, Portland OR

  

Silver Creek Trail

Sagebrush Trail completed the design and construction documentation for a 2 + mile soft surface trail in the Silver Creek neighborhood in Park City, Utah.












Payroll Trail at Deer Valley

In the summer of 2012 we planned, designed, and constructed a new downhill trail for Deer Valley Resort. This trail is fast with flowy berms, bumps, drops, jumps, and a section that runs in and out of a gully.









Trail at Sagebrook HOA

Planning, design, and construction of one mile of natural surface trail built with my machines. It was designed for beginners as the neighborhood is full of kids and moms with baby joggers.


XC Ski Trails near Utah Olympic Park
















































This is a project I managed for Basin Rec. I worked with Gordon Lange, an ex US Ski Team coach and coach of the local nordic program, Jaime Kimball from the Utah Olympic Park, representatives of the open space commity, and co-workers at Basin Recreation where I helped plan and design 5 kilometers of XC ski trails. I managed the construction of the trail where I coordinated with contractors and supervised the Basin Rec trail crew. This project included brush mowing, forest mulching, excavating a 20' wide bench, placement of culverts, hydroseeding, etc.